NAIA Terminal 3 / Pasay City, Philippines

Powering the Gateway Ensuring Operational Continuity at NAIA Terminal 3 with MGS

MGS1500B-DC, Built for Data Centers

Who:

NEW NAIA INFRA CORP. for
Ninoy Aquino International Airport (NAIA) Terminal 3

What:

Mitsubishi MGS1500B Diesel Generator Set with Enclosure

Where:

Pasay City, Philippines

As the primary international gateway to the Philippines, Ninoy Aquino International Airport (NAIA) Terminal 3 demands 100% power reliability to ensure the safety of millions of passengers and the fluidity of global trade. Following a series of high-profile power disruptions that paralyzed airport operations, Kilton Motor Corporation was tapped to provide a robust standby power solution. Kilton successfully delivered and installed the Mitsubishi MGS1500B (1700kW / 2100kVA), a Japanese-engineered powerhouse designed to provide immediate, high-capacity backup during grid failures.

The Critical Context: The High Stakes of Airport Power

In an airport terminal, electricity is more than a convenience—it is a life-safety requirement. A total power loss at NAIA Terminal 3 affects:

The Challenge: A History of Disruption

Before the recent upgrades, NAIA Terminal 3 faced severe criticism due to aging electrical infrastructure and a lack of sufficient redundancy. 

Major incidents that underscored the urgency of this project include:

  • January 1, 2023: A catastrophic power failure at the Air Traffic Management Center (ATMC) resulted in the total closure of Philippine airspace. Over 600 flights were cancelled, stranding 65,000+ passengers on New Year’s Day.
  • May 1, 2023 (Labor Day): A 10-hour power outage hit Terminal 3 specifically, caused by a fault in the main circuit breaker. This led to the cancellation of 40+ domestic flights and impacted nearly 10,000 passengers during a peak travel holiday.
  • June 2023: Another significant outage caused flight delays and long queues at immigration, further damaging the airport’s international reputation.

source: link

A Real and Recognized Operational Challenge

These events highlighted a critical “single point of failure” and the desperate need for a high-load acceptance standby system that could take over the terminal’s most vital loads within seconds.

The Kilton Solution: Mitsubishi MGS1500B

To address these challenges, Kilton Motor Corporation provided a turnkey installation of the Mitsubishi MGS1500B.

Technical Specifications:

Implementation & Installation

Soundproof, weatherproof, powder-coated enclosure complete with soundproofing material and guaranteed decibel of 85 dBA at 3 meters

Containerized MGS1500B

  1. Site Assessment: Analyzing the specific load requirements of Terminal 3’s critical systems.
  2. Logistics & Delivery: Navigating the complex security and operational constraints of a functioning international airport.
  3. Installation & Integration: Seamlessly integrating the 400V system with the existing electrical grid and Automatic Transfer Switches (ATS).
  4. Commissioning: Rigorous testing to ensure the unit meets the stringent standby response times required by the Manila International Airport Authority (MIAA).

In a terminal environment, there is no room for "fail-to-start" scenarios. The MGS series features advanced digital control systems and robust fuel efficiency, ensuring that during an extended blackout, the airport can maintain operations for hours or even days.

Why Mitsubishi?

Recognizing the importance of proven Japanese reliability for critical airport operations, New NAIA Infra Corp. engaged Kilton Motor Corporation for the MGS1500B. The selection reinforces confidence in the MGS Series’ ability to support large-scale, mission-critical facilities requiring consistent and dependable power.

MGS1500B’s carefull handling from Carmona plant to NAIA T3 site

Beyond product performance, Kilton’s **established after-sales service capability—trusted across the industry—**played a key role in ensuring long-term operational assurance. With dedicated technical support, preventive maintenance expertise, and responsive service teams, Kilton continues to provide reliability not only at installation, but throughout the entire equipment lifecycle.

The Outcome: Powering Confidence and Progress

The successful delivery of the Mitsubishi MGS1500B at NAIA Terminal 3 stands as a testament to Kilton Motor Corporation’s commitment to “Powering Your Success.” By solving the power stability issues of the nation’s most vital transport hub, Kilton has not only installed a generator—it has reinforced the backbone of Philippine tourism and commerce.

Kilton Bldg., #6 Golden Mile Avenue,
Golden Mile Business Park, Brgy. Maduya, Carmona, Cavite, Philippines

Tel Nos:
+63 2 8889 1023 / +63 2 8844 5032
+63 2 8736 3650 /  +63 2 8844 5031
Telefax: +63 2 8889 1023

Sales Hotline: (SMS, Viber, WhatsApp)
+63 961 780 2771

Services and Parts Hotline:
(SMS, Viber, WhatsApp)

+63 922 838 2034 +63 917 534 0474
+63 961 780 2771 +63 28664 9996

Mitsubishi Generators

About MGS

Features

Performance

Performance

Resource Center

FAQ's

Brochures

Gallery

Case Studies

Kilton Motor

About Us

Services

Latest News

Kilton Bldg., #6 Golden Mile Avenue, Golden Mile Business Park, Brgy. Maduya, Carmona, Cavite, Philippines

Tel Nos:
+63 2 8889 1023 / +63 2 8844 5032
+63 2 8736 3650 /  +63 2 8844 5031 Telefax: +63 2 8889 1023

Sales Hotline: (SMS, Viber, WhatsApp)
+63 961 780 2771

Services and Parts Hotline: (SMS, Viber, WhatsApp)
+63 922 838 2034 +63 917 534 0474
+63 961 780 2771 +63 28664 9996

Mitsubishi Generators

About MGS

Features

Performance

Legacy Units

Resource Center

FAQ's

Brochures

Gallery

Case Studies

Kilton Motor

About Us

Services

Latest News

© 2023 Created with Royal Elementor Addons